Results Snapshot
OEE Increase
41% → 65%
Implementation Time
3 months
Key Impact
Availability & Short Stops
Challenge
Packaging lines experienced high unplanned downtime and material flow disruptions, with limited root-cause visibility between maintenance and operations teams.
Approach
- Connected machine signals to SkyTON for real-time performance tracking.
- Established baseline OEE and loss categorization by shift and line.
- Conducted weekly Pareto analysis on downtime and micro-stops.
- Implemented structured corrective actions targeting the top recurring losses.
Outcomes
- OEE improved from 41% to 65% within three months.
- Significant reduction in unplanned downtime and idle time.
- Improved coordination between production and maintenance teams.
Want Results Like This?
Let us review your current line losses and propose a practical rollout plan.
Want Results Like This?
Let us review your current line losses and propose a practical rollout plan.