Improved OEE from <25% to >50% on a Critical Filling Line

Food & Beverage Manufacturing

Improved OEE from <25% to >50% on a Critical Filling Line

A high-volume filling line with chronic downtime and unclear loss tracking was stabilized through real-time OEE visibility and structured daily improvement routines.

Increased OEE from 41% to 65% in 3 Months on Packaging Lines

Cement Manufacturing (GCC)

Increased OEE from 41% to 65% in 3 Months on Packaging Lines

A cement plant in the GCC improved line efficiency by replacing reactive reporting with real-time downtime analytics and structured loss elimination.

Reduced Downtime by 35% in a Multi-Line Packaging Facility

Packaging & High-Mix Production (UAE)

Reduced Downtime by 35% in a Multi-Line Packaging Facility

A UAE-based packaging facility stabilized throughput by uncovering hidden micro-stops and improving shift-level performance management.

Book a Free Consultation

Share your goals and we will map practical OEE improvement opportunities for your site.

Book a Free Consultation

Share your goals and we will map practical OEE improvement opportunities for your site.

Next step: we review your request and respond within 1 business day.

By submitting, you agree to our Privacy Policy and Terms.

Prefer email?

Email Icon [email protected]
Consultation

Prefer email?

Email Icon [email protected]

© 2026 SkyTON. All rights reserved. Privacy | Terms