Food & Beverage Manufacturing
Improved OEE from <25% to >50% on a Critical Filling Line
A high-volume filling line with chronic downtime and unclear loss tracking was stabilized through real-time OEE visibility and structured daily improvement routines.
Cement Manufacturing (GCC)
Increased OEE from 41% to 65% in 3 Months on Packaging Lines
A cement plant in the GCC improved line efficiency by replacing reactive reporting with real-time downtime analytics and structured loss elimination.
Packaging & High-Mix Production (UAE)
Reduced Downtime by 35% in a Multi-Line Packaging Facility
A UAE-based packaging facility stabilized throughput by uncovering hidden micro-stops and improving shift-level performance management.
Book a Free Consultation
Share your goals and we will map practical OEE improvement opportunities for your site.
Book a Free Consultation
Share your goals and we will map practical OEE improvement opportunities for your site.
Prefer email?
[email protected]